Why fleets still struggle

The cost of how it’s done today

Dry-dock specs assembled in Word and priced in email lose the link to PMS work, and extras discovered in the yard blow the budget with no approval trail.

The traditional approach

A spec document rebuilt each docking, yard quotes compared by hand, and extras reconciled from invoices weeks after the ship has sailed.

Solution — Dry Dock: desktop screenshot

With WaterTightVM

What changes when this is under control

A dry-dock workspace for the whole docking: build the spec from PMS jobs, defects and vessel equipment, compare yard quotes, track extras and variation orders, plan the yard stay on a timeline, log progress daily and clear the undocking checklist.

Time back

Spec lines come from PMS jobs, defects and vessel equipment instead of being retyped, and a previous docking's spec can be copied across as the starting point.

Less waste

Extras are logged with cost and approval references, and each variation order is quoted, approved or rejected with its cost and schedule impact, so yard invoices reconcile against an authorised trail, not guesswork.

Lower risk

The base spec locks when a quote is awarded or docking starts, keeping approved scope separate from new work, and a punch list warns you if critical class or undocking items are still open when docking is finished.

In the module

How Dry Dock delivers it

Dry-dock project spec builder with general terms

Spec lines from PMS jobs, defects and vessel equipment

Copy a spec from a previous docking

Yard quote comparison

Extras and variation order approvals

Timeline (Gantt) with an out-of-water window

Punch list and undocking checklist

Daily progress chart, report and owner update

Capabilities

  1. Per-vessel projects with yard windows and a fleet dry-dock calendar
  2. Spec lock on quote award, or when you start docking
  3. Ownership per job: yard, subcontractor or crew
  4. Criticality and out-of-water flag on every job
  5. Photos attached to line items, shown in the spec PDF
  6. Spec, extras and dry-dock report PDFs, with a per-job option to leave work out of the yard PDF
  7. Yard Excel export for tendering
  8. Actual cost capture during the yard stay
  9. Links to PMS equipment UIDs
  10. Summary totals for management review, including approved and pending variation orders

Ship to shore

How the work moves

  1. Superintendent creates a dry-dock project and yard window
  2. Spec lines come from PMS jobs, defects, equipment or a previous docking, and general terms are added
  3. Yard quotes are compared and one is awarded, locking the spec
  4. Docking starts: progress is logged daily, variation orders are approved or rejected and the owner update goes out
  5. Punch list is cleared, docking is finished and the report is exported
Dry Dock: mobile app view

Questions before you commit

Which plans include dry dock?
Dry dock is included from the Advanced plan up (Advanced, Pro and The Works). It is not included in Single Operator or Starter.
Can the spec pull from PMS?
Yes. Spec lines can import from PMS jobs and defects so the yard scope reflects real outstanding work, and lines can link back to equipment UIDs for post-dock traceability. You can also add equipment jobs by picking vessel equipment, with sub-tasks, a criticality and an out-of-water flag, or copy the spec from a previous docking with progress reset to zero.
How are extras kept separate from the base spec?
Extras are logged on their own tab with description, cost, and approval reference. The base spec locks when a quote is awarded or when you start docking, so extras never blur the approved scope.
Can I compare multiple yards?
Yes. Yard quotes are compared against spec lines so you can review pricing before awarding.
How do variation orders work?
Each extra can carry a variation order decision: requested, yard quoted, approved or rejected, with the cost, the schedule impact in days and approval or rejection notes. The summary shows approved and pending variation order totals and the days added.
Can I plan and track the yard stay?
Yes. Set planned start and end dates on each job and the Timeline tab shows them as a Gantt chart, with an out-of-water window for jobs that need the vessel on blocks. Once docking has started, log progress by job and sub-task for any date. The summary shows overall progress, progress by category and a daily progress chart, and a dry-dock report PDF is available.
Can I update the owner or management each day?
Yes. The Daily Update can be emailed to the addresses you enter, with an optional superintendent note, or downloaded as a PDF. The email carries the update in the message itself.
Is there an undocking checklist?
Yes. The punch list holds punch items, class survey items and undocking gates. You can load a built-in undocking checklist in one click, and finishing the docking warns you if critical items are still open.
Do exported PDFs prove work was done?
No. Spec and extras PDFs organise your records for yard and surveyor meetings; completion still requires human verification.

See it in 30 minutes

Book a 30-minute call and we'll show Dry Dock on a sample vessel, set up the way your technical superintendent and project manager work.

Any questions, just get in touch. If you’re not sure we cover something you need, outline the issue and we’ll find a way to solve it.

Book a 30-minute call Ask a question

Book a 30-minute call